Just had delivered the flat pack rix engineering watts linkage kit. Due to being a complete idiot I have welded in the turrets and 4 link kit before replacing the complete boot floor. I had to cut the boot floor into two pieces front and rear at the middle hole of the boot floor about 2” past the back of the link box so the forward part of the floor is welded in around the link boxes. The question is then do I fit the watts link before fitting the final part of the floor I have access to chassis rails and I can slide the floor in and out as I have a new boot slam panel to fit as well thanks